sewage and rainwater projects works with pumping stations, treatment plants and road works for Shatt Al-Arab, Safwan and Umm Qasr.
-No.3 treatment plants with a capacity of 10,000 cubic meters / day
-No.17 different capacity pumping stations
-erection works for UPVC pipes with a total length of 260,000 meters, with diameters from 150 mm to 1400 mm
– erection works for GRP pipes with a total length of 36000 meters, with diameters from 1600 mm to 2100 mm
-Road works of 3 million square meters