Al-Abbas Irrigation River Works Project for Basra Governorate, including:
-the works of a soil embankment section of 36 km -lining works with concrete 36 km
-works of preparing and pouring the floors of sedimentation basins with dimensions 833 * 220, number 2 with a thickness of 25 cm
– works of brick walls with concrete foundations 4,500 cu.m brick & 2,500 cu.m reinforced concrete
-works of box and tubular and concrete bridges and bridges.