BP Camp Project Phase1:

It one of the important and large projects as it represents a miniature city with all its services of a very high level, which includes:

-Earth works (ditch and berm) fence 4,000 m.l

-chain-link fence work 4,000 m.l

-Reinforced concrete fence work 4,000 m.l

-Earth works (cut & fill) 1,500,000 cu.m

-Earth works for roads 150,000 cu.m

-Water network UPVC pipes from 50mm to 400mm total of 25,000 m.l with pump stations, concrete tanks, RO unit with capacity 200 cu.m/day

-Irrigation network HDPE pipes from 50mm to 220mm with pump stations, steel tanks, valve chamber and accessories

-sewage network with sedimentation tank and manholes used UPVC pipes 110mm to 600mm total length of 12,000 m.l

-Rain water network with manholes used UPVC pipes from 200mm to 1,100mm total length 7,000 m.l

-Supply & erection of 5 diesel generators with total capacity of 6,250 Mva with synchronization

-Supply & erection electrical power  and lighting control panels

-Supply & erection cables in different sizes with total length 128,000 m.l for power, 40,000 m.l for lighting and 360,000 m.l landscaping lighting

– Electrical poles and fixture in different sizes no. 2,700

-Landscaping works includes interlock works 200,000 sq.m, grass 200,000 sq.m, trees different types no.30,000, flowers no.150,000 and palms no. 80

-Firefighting system

-Fire alarm system total wiring of 320,000 m.l with addressable panels

-CCTV system, PA system, fiber optics and internet

-ELV network used UPVC  48,000 m.l 110mm dia. With concrete manholes

-Administrative buildings caravan 18,500 sq.m

-Services buildings & warehouses 15,000 sq.m

-Residential buildings 15,000 sq.m

-Petrol station, wash station

-Roads works with gates  

-Sewages treatment plant 80 cu.m/day with steel tanks

ClientBritish Petroleum
Location of Project Basra
Year of Accomplishment2010