ClientAl-Diwaniyah Governorate
Location of Project Al-Diwaniyah
Year of Accomplishment2007 - 2008

 -supply & erection GRP pipes 1,100 to 1,600 mm total length 32,000 m.l with reinforced concrete manholes

-supply & erection concrete pipes with a diameter of 2,100 to 2,800 mm total length 16,000 m.l with reinforced concrete manholes

-Sheet-pile works shoring system 

-Hydraulic shoring system

-De-watering system